Original title: The construction of the bridge construction of Nanjing section of Jiangsu Nanfang Railway entered the end of the ending sprint stage. This is the construction site of the Jiangsu Nanfang River Intercity Railway Nanjing Section Station on April 28 (photos of drones).
Recently, bridges and other bridges such as Jiangsu South River Intercity Railway Nanjing section station in the Nanjing section station in the Nanjing section of the Jiangsu South River in China Railway are stepping up construction.
According to the Jiangsu Provincial Railway Group, at present, only 6 consecutive continuous beams remaining in the Nanjing section of Jiangsu South along the Jiangsu Intercity Railway have not yet completed the dragon.
The intercity railway in the south of Jiangsu is an important part of the planning of the comprehensive three -dimensional traffic corridor of the Yangtze River Economic Belt. The length of the positive line is about 278 kilometers and the design speed is 350 kilometers per hour.
Xinhua News Agency reporter Li Bo (responsible editor: Xiao Xiao, Tang Lulu) shared more people to see.